August 15, 2012
Khun Pariwat Vattanasup (TARCO Senior Operations Manager) and operation staff, welcomes Joint Inspection Group (JIG) inspector from Total. The inspection is aimed to ensure that TARCO operational and quality control operated in accordance with JIG guideline. The inspection was conducted on August 15, 2012 at Suvarnabhumi Airport.
back